| Tanzania Songea-Makambako Road Post-Construction Maintenance Project |
| The Songea-Makambako Road Post Construction Maintenance Project established and supported the Songea-Makambako Road Maintenance Unit. The project period was July 1986-June 1992.... |
Funding Agency: World Bank Start Date: July 1986, End Date: June 1992Funding Amount: £5.1m Implementing Organization: DFID Address: 1 Palace Street, London SW1E 5HE
Telephone: +Tel: 0845 300 4100 (local call rate from within the UK)Tel: +44 1355 84 3132 (from outside the UK) Fax: +Fax: +44 (0) 1355 84 3632
Email:
Email: enquiry@dfid.gov.uk
Website:
Link
|
| Tanzania - Urgent Roads Rehabilitation Support Program - Phase I |
| The objectives of URRSP, Phase-1 (the Project) are to remove major
constraints to transport services on the country's road network, to reduce
poverty by promoting economic activities, and to strengthen the
implementation and management capacity of TANROADS. The Project
comprises (i) feasibility studies and detailed designs of trunk and
regional roads; (ii) feasibility study of national feeder roads; (iii)
rehabilitation/upgrading of a 115 km trunk road section of the Central
Corridor; (iv) road condition survey and road inventory; and (v) technical
assistance for road sector management capacity building. The project also
includes HIV/AIDS awareness components to minimize/prevent possible
adverse effects of the project...
|
Funding Agency: World Bank Start Date: July 19, 2004,Funding Amount: USD 242.48 Millions Implementing Organization: TANROADS Address:
TANROADS
Telephone: +255-22-2-2150101 Fax: +255-22-2-150022
Email:
tanroadshl@cats-net.com
Website:
Link
|
| Tanzania - Second Integrated Roads Project |
| The principal objective of the Second Integrated Roads Project is to support the country ' s economic recovery program by reducing transportation costs, improving accessibility to economically productive areas, and strengthening overall sector administration and organizational and financing arrangements in the roads subsector. The project will support: (i) upgrading, rehabilitation and maintenance of high priority trunk, regional and essential district road networks (including bridges and culverts); (ii) policy and institutional reforms to improve sector administration, management and financing of the road network and efficient provision of road transport services; (iii) a pilot program to improve village travel and transport through rehabilitation and maintenance of road infrastructure, improving access to intermediate means of transport and through non-transport interventions; and (iv) resurfacing of the runway at Kilimanjaro International Airport to improve safety and ensure continuation of services... |
Funding Agency: World Bank Start Date: 1994, End Date: 2004Funding Amount: USD 582.4 Million Implementing Organization: Government of Tanzania
Website:
Link
|
| Water Supply Programme Regional Centres I (Mbeya, Mwanza, Iringa) |
| Euro 22.0 million (Phases I-III) EC/European Development Fund Rehabilitation and extension of the water supply and sanitation systems of the three towns, including pipelines and water treatment and storage facilities, leakage reduction, installing meters, institutional strengthening |
Funding Agency: KfW, German Start Date: 2003, End Date: 2007Funding Amount: Euro 22.0 Mil. Implementing Organization: Consultant Address: Local Representative, 65 Ali Hassan Mwinyi Road, P.o Box 1519, Dar es Salaam, Tanzania Telephone: ++255 22 2128189/90 Fax: ++255 22 2128192
Website:
Link
|
| Urban Water Supply Songea I-II |
| Rehabilitation and extension of Songea's water supply system; including pipelines and storage facilities; installation of a sewage disposal system |
Funding Agency: KfW, German Start Date: 2003, End Date: 2007Funding Amount: Euro 16.7 Mil Implementing Organization: Urban Water and Sewage Authorities of Mbeya, Mwanza and Iringa Address: Local representative,65 Ali Hassan Mwinyi Road, P.O. Box 1519,Dar es Salaam, Tanzania Telephone: ++255 22 212 8189 Fax: +255 22 2128192
Email:
kfw@cats-net.com
|
|